He Puna Waiora Mental Health Unit

Lounge
Lounge
  • Lounge
  • Ceiling Void Cable Trays
  • Ceiling Void Cable Trays
  • Ceiling Void Cable Trays
  • Ceiling Void Cable Trays
  • Power Circuit Cable Pull
  • Main Plant Room
  • Main Plant Room
  • Mains Cabling to hospital MSB's
  • Mains Cabling to hospital MSB's
  • Hospital MSB Connection
  • Main Switchboards
  • Main Switchboards
  • Main Switchboards
  • Main Earthing Bar
  • Lightning Protection Earthing Trenches
  • Lightning Protection Dynasphere Installation
  • Lighting Installation
  • UPS Control Gear

This project was a new 45 Bed Mental Health Unit for the WDHB.
Our work included:
800Amp Mains Cabling - Essential (Generator) and Non-Essential Supplies.
Main Switchboards and Distribution Boards.
Full Cable Support Systems (Cables trays/Baskets) for electrical and associated trades.
All bedrooms and support offices were Body Protected Areas.
Power Factor Correction Systems.
UPS System.
Lightning Protection System - Including full re-design to a Dynasphere Active Lighting Protection System.
After being awarded the project we worked with one of our light suppliers to design a new LED light fittings specifically for this project, not an easy task as every light in this building must be accessed from the ceiling space, is required to have a very high impact/vandal resistance and needed to meet strict light output requirements. This fittings (at no extra initial cost to the client) were able to offer great power savings, highly extended lifetimes and much lower light output degradation.